The drive train for the Evolve project has been completed with the main engines on their Vulcan mounts, Twin Disc transmissions, Vulcan shaft couplings, shafts, stern tubes, P struts, cutlass bearings all mounted and aligned. The fire and bilge systems piping are completed and ready for painting. The Econosto fuel manifolds are mounted and the fuel system is now undergoing pressure testing. The interior carpentry installation is still moving along nicely.